Engineering and fitting out of Repair department for valves and piping and SSV

This enterprise is one of the most modern oil refining plants in Russia and is one of the largest in the world. In 2012 oil refining volume was - 20,95 million tons.

Project purposes:

  1. Revision and repair of valves and piping (dampers and taps), reverse valves, safety valves considering peak loads during the repair of units «in chains».
  2. Reduce the risk of lost profit because of technological units down time during repairs due to insufficient capacity and effectiveness of the existing area of valves and fittings revision and repair.

Проект цеха по ремонту арматуры

Purpose: Engineering and fitting out of Repair department for valves and piping and SSV

Nominal productivity of the areas:
valves and piping – 60 pc./ per shift
safety valves – 10 pc./ per shift

Economical effect ≈ 126,1 million rubles – cost of technological units down time during repair peaks